HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > Stock and Super Stock
Register Photo Gallery FAQ Community Calendar

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-24-2017, 09:15 PM   #1
Sam Murray
Member
 
Sam Murray's Avatar
 
Join Date: Jul 2002
Location: Cummaquid, Mass
Posts: 445
Likes: 413
Liked 60 Times in 29 Posts
Default Route 222 Construction Heads up

Just wanted to give everyone coming down Rt 222 from the north towards Maple Grove a heads up. The area at the Sheetz and Hess gas stations is under construction with only one lane of traffic in each direction. Took over 50 minutes to get thru it this afternoon.
__________________
Sam Murray
1616 STK
Sam Murray is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 08:34 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.