|
![]() |
#18 |
VIP Member
Join Date: Oct 2013
Location: Gulf Breeze, FL
Posts: 1,651
Likes: 8
Liked 33 Times in 16 Posts
|
![]()
Plans for this weekend are to begin stripping the interior out of the car in preparation for welding of the subframe connectors and roll bar. Parts to begin drifting in next week...roll bar is being built, expect 3-4 week time frame.
Bought a Team Z UCA kit today for the 8.8 housing... ![]() I'll couple these with some Southside Machine copies of LCA's... ![]() I will be changing the interior color with Black carpet and painting the dash/console either White or Black. ![]() Tentatively planning on removing the E-brake lever and mounting the shifter in that recessed area. ![]()
__________________
Rich Taylor I/SA - 321 |
![]() |
![]() |
|
|