|
![]() |
#3 |
VIP Member
Join Date: Jul 2002
Location: Michigan
Posts: 1,229
Likes: 133
Liked 534 Times in 110 Posts
|
![]()
You have to tear down the day before you set a record, not afterwards, which complicates things. This means showing up on Friday, tearing down, re-assembling, having IHRA "seal" the engine, and then setting the record the following day.
__________________
Jim Kaekel 3836 STK |
![]() |
![]() |
|
|