Photo of Cecil County Re-Paving
1 Attachment(s)
They have poured 4 inches of concrete over top the existing asphalt. It is well past the eighth mile mark. The workers told me today that they are awaiting a decision as to whether the concrete will be extended to the finish lime or not.
|
Re: Photo of Cecil County Re-Paving
Wonder if it will still be 11' at the stripe????????????????????????????????
|
All times are GMT -4. The time now is 10:11 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.