|
![]() |
#5 |
Member
Join Date: Nov 2002
Location: Michigan
Posts: 184
Likes: 10
Liked 390 Times in 34 Posts
|
![]()
Some more progress on the CJ.
![]() Test fit the dash frame. ![]() Bar under the dash was fit, located and tack welded in. ![]() Back brace bar and bars to 3 link upper mount were fit and located. ![]() Side door bars were fit and located. At this point all of the roll cage bars have been fit and located. I will wait on welding the back brace and side bars until I finish up patching some holes in the floor and cutting the floor for transmission and shifter access. Mitch, you will see this car at Milan. I will most likely make my first test runs there. Bob, it was nice meeting you. Jerry, did you get my reply several weeks ago with my number? Bill never called.
__________________
George Wright https://9500rpm.com |
![]() |
![]() |
|
|