No, the car won’t be ready for the April race. Summer at the soonest now. The next big project is to wire the car and I need to give it 2 to 3 months. I’ve done a fair amount of wiring, but haven’t tried a from scratch EFI harness, so I wanna take my time to try and avoid any mistakes. |
|
![]() |
![]() |
![]() |
#142 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Safe place to store the front end so I can work on the car.
![]() ![]() |
![]() |
![]() |
Liked |
![]() |
#143 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Been putting it off being a PITA, but got the fire system 90% plumbed...all 1/4" stainless hard line. Just have to mount the nozzles once a couple more fittings come in.
![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
Liked |
![]() |
#144 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Last weekend I spent some time building a new wishbone, delay box mount and some other small brackets so I could deliver them to powder coating and anodizing.
![]() ![]() ![]() ![]() |
![]() |
![]() |
Liked |
![]() |
#145 |
Senior Member
Join Date: May 2007
Location: DRAGSTRIP
Posts: 873
Likes: 828
Liked 595 Times in 172 Posts
|
![]()
Beautiful!!
__________________
5664 GHI/SA CAMARO |
![]() |
![]() |
Liked |
![]() |
#146 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Some more progress this week. Powder coating and anodizing came back.
Inside fire nozzle centered above the transmission. ![]() Switzter Dynamics fuel rails anodized very nicely. ![]() ![]() Custom switch mount, MAC valve mount and delay box mount on the shifter. ![]() ![]() Custom pinion sensor mount, Davis Technologies sensor & ring. ![]() Wishbone mounted. ![]() ![]() Upper fender mounts anodized. ![]() ![]() Hatch hinge/roof supports. ![]() Tim McAmis light weight fuel cell cap anodized. ![]() ![]() |
![]() |
![]() |
Liked |
![]() |
#147 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Preparing to start wiring here soon. The plan is to start in the back and work my way forward. Needed to mock up the shock sensors to wire them, but the shock simulator blocked them from bolting up forcing me to mock up the shocks temporarily. Simulator goes back on as soon as the rear wiring is complete.
![]() ![]() ![]() ![]() |
![]() |
![]() |
Liked |
![]() |
#148 |
VIP Member
Join Date: Jun 2006
Posts: 3,396
Likes: 480
Liked 318 Times in 171 Posts
|
![]()
ABSOLUTELY GORGEOUS AND FLAWLESS WORKMANSHIP--- I envy you---FED 387
|
![]() |
![]() |
![]() |
#149 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Small update on the most recent progress. First off was to prepare to bond the roof supports to the cage. This required stripping the powder coat off to bare metal, yet not damage the powder coat outside of the bond area. Alot harder than it should have been because like a dummy I put the tubs in the car and my access to reach the area was gone now. Had to reach from outside the car making it quite challenging.
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |
Liked |
![]() |
#150 |
Member
Join Date: Feb 2002
Posts: 328
Likes: 64
Liked 345 Times in 149 Posts
|
![]()
Next up was to finish up the parachute. The old chute bag was badly sun faded so I got a new replacement. The aluminum spring can was pretty beat up from the crash so I straightened it as best as I could then had it powder coated in an effort to save it. Lastly, a new chute cable installed.
![]() ![]() ![]() ![]() ![]() ![]() The last few things were to install new door lock cylinders then sandblasting the trunk latch & hardware then installing as well as the trunk lock cylinder. ![]() ![]() ![]() ![]() ![]() |
![]() |
![]() |