|
|
![]() |
#1 |
Senior Member
Join Date: Jul 2014
Posts: 572
Likes: 39
Liked 53 Times in 38 Posts
|
![]()
I took the roof off my 64 Savoy in 2 hours (stripped already) to weld up the top of cage. Melted the lead at the joints then drilled out spot welds. If I did it again I’d just use a saws all at the lead joints. Tig it back, lead it and be done.
|
![]() |
![]() |
Liked |
![]() |
Thread Tools | |
Display Modes | |
|
|