|
![]() |
#2 |
VIP Member
Join Date: Dec 2001
Location: Texarkana Ark/TX
Posts: 2,446
Likes: 575
Liked 880 Times in 311 Posts
|
![]() Ron, You only need enough volume to overcome the required flow of your clearances. This Melling might be a good choice for you: 10774 10774Standard volume performance upgrade for M-77. The housing and cover are CNC machined and phosphate coated. The lower pressure spring is included to reduce pressure if desired. Includes intermediate shaft with steel guide. Uses 3/4” press in screen.
__________________
Adger Smith (Former SS) |
![]() |
![]() |
|
|