|
![]() |
#7 |
VIP Member
Join Date: Jun 2002
Posts: 1,855
Likes: 83
Liked 444 Times in 145 Posts
|
![]()
The supplier is running the cost numbers and discussing the gears with his engineering staff. I should have some feedback before the PRI Show.
__________________
Bruce Noland 1788 STK |
![]() |
![]() |
|
|