Thread: Project 66 Nova
View Single Post
Old 12-23-2012, 01:12 PM   #93
Paul Merolla
Senior Member
 
Paul Merolla's Avatar
 
Join Date: Dec 2001
Location: Papillion, NE
Posts: 608
Likes: 238
Liked 293 Times in 65 Posts
Default Re: Project update

I noticed the new build forum this morning and asked Ken to move this thread into it...then I saw that it's been 6 months since I added anything...so here we go:




The dash is taking shape, along with the wiring. All that's left for wiring is the line lock button, tach, and the microswitch on the clutch pedal. I cut the cost of the gauges a bit by going with the mechanical oil pressure, but I had to have the electric water temp so I splurged on that one. Got a scrap of 1/8" aluminum and made the gauge panel, then I used a scotchbrite disc on my drill to make the swirl marks.







The work in the trunk is 99% done, I just need to finish my battery hold-down.




Under the hood is also really close, just needs radiator hoses and a few odds and ends. And the Q-Jet is under the Christmas tree!




Here's my Suzuki Samurai alternator...it's one of the few applications that have the small Nippondenso with a v-belt pulley. $80 at O'Reilly's.




I don't have any pics, but I broke down and bought a pair of Kirkey aluminum seats. I hate the idea, but in the end, cost and weight savings won out. I think maybe next winter's projects might include having some Nova SS lookalike covers made for them.
More pics to come pretty soon.
Paul Merolla is offline   Reply With Quote