|
|
![]() |
#1 |
Member
Join Date: Jun 2002
Location: York, PA
Posts: 241
Likes: 0
Liked 1 Time in 1 Post
|
![]()
Dave,
take the sending unit out and cut off the fuel lines on both sides, then drill it out for a bulkhead fitting either # 6 or # 8 depending what size line you want. Use steel tubing to replace the inside line, flare the end and secure it using a tube nut.
__________________
Bill Belden Retired Stock Eliminator [emailSTK1100@comcast.net[/email] |
![]() |
![]() |
![]() |
#2 |
VIP Member
Join Date: Feb 2003
Location: Glendale, Arizona
Posts: 3,040
Likes: 712
Liked 1,568 Times in 579 Posts
|
![]()
In lieu of steel tubing, I would recommend the use of aircraft aluminum tubing. Does not corrode, lighter and absorbs vibration and harmonics without breaking at the fitting.
|
![]() |
![]() |
![]() |
#3 |
VIP Member
Join Date: Dec 2001
Location: Arkansas - In the middle of everything.
Posts: 1,999
Likes: 64
Liked 772 Times in 192 Posts
|
![]()
I have also used copper tubing bent to shape and soldered in place through the flange for the pickup tube. I believe GM solders the steel tubing in place from the factory. You can even solder the float sending unit onto the copper tube and have the stock fuel gauge work.
|
![]() |
![]() |
![]() |
#4 | |
VIP Member
Join Date: Oct 2007
Posts: 1,168
Likes: 487
Liked 346 Times in 126 Posts
|
![]() Quote:
Dave |
|
![]() |
![]() |
![]() |
Thread Tools | |
Display Modes | |
|
|