|
![]() |
#11 |
VIP Member
Join Date: Dec 2001
Location: phoenix
Posts: 1,486
Likes: 66
Liked 704 Times in 281 Posts
|
![]()
It should be easy enough. We would run drag tractor down and test all increments while dragging track. Tower would send a test print first then tractor ET next with increments. Sometimes not all the increments would work due to the ground squirrels liked our wiring. Poured gas down the holes and lit them up. Stopped the problem for awhile.
|
![]() |
![]() |
Liked |
|
|