HOME FORUM RULES CONTACT
     
   
   

Go Back   CLASS RACER FORUM > Class Racer Forums > Stock and Super Stock
Register Photo Gallery FAQ Community Calendar


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-09-2016, 08:37 PM   #1
Joe Greek
Member
 
Joe Greek's Avatar
 
Join Date: Feb 2003
Location: Elmwood Park, NJ
Posts: 139
Likes: 3
Liked 30 Times in 5 Posts
Default Craig Trabucco's corvette, pt.2

I'm finishing up with the painting on the roll-bar, suspension and installed all new rug. I'm now waiting on the motor and transmission. I've gone over the car and re-did the fuel system, fuel cell and fuel pump, electrical switch, installed new rear with suspension and 4 link, new brakes and lines, master cylinder. Now hoping soon to put motor and transmission in the car to get it ready for 2016 season. My pictures are too bigto post, but you can see them in my photo gallery
Joe Greek is offline   Reply With Quote
 



Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump


All times are GMT -4. The time now is 08:22 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright © Class Racer.com. All Rights Reserved. Designated trademarks and brands are the property of their respective owners.