Some more progress on the CJ.
Test fit the dash frame.
Bar under the dash was fit, located and tack welded in.
Back brace bar and bars to 3 link upper mount were fit and located.
Side door bars were fit and located.
At this point all of the roll cage bars have been fit and located. I will wait on welding the back brace and side bars until I finish up patching some holes in the floor and cutting the floor for transmission and shifter access.
Mitch, you will see this car at Milan. I will most likely make my first test runs there.
Bob, it was nice meeting you.
Jerry, did you get my reply several weeks ago with my number? Bill never called.