More progress on the CJ.
Holes in firewall have been patched.
Mike (MPR) built the Nine Inch Ford Housing. the housing and the dash frame were sent out and powder coated.
A tab for the shoulder harness was welded to the back brace bar. A short piece of 1-1/4" tube was fit and welded to the back brace. I will then fabricate a telescoping adjustable seat back pad out of a piece 4" x 4" x 1/8" steel and a piece of 1-3/8" tubing that will slip over the 1-1/4" tube.