View Single Post
Old 05-03-2016, 02:25 PM   #9
ALMACK
VIP Member
 
ALMACK's Avatar
 
Join Date: Jan 2009
Location: Bardstown, KY
Posts: 1,928
Likes: 98
Liked 324 Times in 116 Posts
Default Re: Project " Preparation H "...preparing a 2005 Mustang GT

So my day at the welder came. Everything went perfect. All the planning and prep work paid off.

From the time the car went into his shop until I drove out was 2 1/2 hours.
Everything fitted perfect and I was super happy there were not any burn marks on the interior panels.
He had done alot of roll bar installations before, so he had all the right protective equipment.

These pics were taken the day after the welding was done, and within 24 hours of getting back from his shop, the interior was all back in the car.







I had the passenger side seat belt tabs welded on while there so in the future they will be there when I drive this car on the street.




Trunk area rear bar mounts







I found this at Lowes and really like this paint. Goes on nice and is great on touch ups as it blends well with the existing paint. Plus, that satin look is my favorite look for a roll bar.

__________________
Alan Mackin Stock 3777/ SS 3377
P/SA & SS/PA Fox Thunderbird
I/PS '95 Mustang GT
ALMACK is offline   Reply With Quote
Liked