Quote:
Originally Posted by gbur
reinforce rails by tac welding several strips so they stay located, before cutting ,measure x10, one cut
|
That was a thought I had. I have a couple of spare lengths of 2X2 to tack to the back or bottom side of the cut area to hold everything in place for the surgery. I've seen temporary X braces used, too, but I don't have enough room for that. I have a Total Control sub frame connector and frame brace system installed and the unit keeps the frame quite stiff.
Dale